CoasterDynamix Comet - Construction Log






2 layers of grass have been applied to the base.
















Track completed and Lift Guide added.


Horizontal bracing added to vertical frame pieces & Walkway added.






Handrails & Station Floor added.






The animated neon sign is an optional extra.



Video@YouTube



Back to Faller Home Page